FAQs

Inside look FAQs answered

How involved can I be in the design process?

We believe in collaboration and value your input throughout the design process. We encourage clients to actively participate in discussions, share their ideas, preferences, and feedback.

From the time the drawing is finalized, the time span required for production is usually around 45 to 90 days (1.5 to 3 months), depending on the required quantity and style.

The factory does not provide design. If necessary, the factory can help customers find suitable designers for cooperation.

The customer signs and confirms the final drawings, material list and contract, pays the deposit, and starts production. The production and packaging are completed within the contract time. After receiving the remaining full amount, transportation and installation are carried out.

The product does not include hardware. The price and quality of hardware vary greatly. We help customers purchase it according to their needs.

Cabinets are divided into floor cabinets and ceiling cabinets, usually calculated by meter.

F4>ENF>E0>E1. F4 is the Japanese standard, ENF is the national standard. The systems are different and cannot be directly compared, but the F4 standard is a bit more stringent.

get in touch

How can we assist?